Fermi expects to deploy BESS to manage volatile AI training and agentic load swings on its campus power network.
“We expect BESS to play an important role in campus power quality and reliability. The battery systems that we have specified and configured are designed to respond in nanoseconds to manage volatile AI training and agentic load swings and power supply transients associated with AI workloads, and can also, as a secondary feature, provide ride-through capability and immediate backup power in the event of generation plant or grid interruptions. As the campus scales, we expect to deploy BESS and associated controls to support intra-second load volatility management, load shaping, reserve capacity, and other reliability attributes across our private power distribution network.”